SS SRLS LOGO

SS SRLS

Newbuilding and Refit Solutions

Contact Us

Naval Welding & Carpentry Contractors

48H Mobilization | RINA Certified | Italy/France

TRUSTED BY

What We Do

Naval welding & carpentry contractors - Block prefab to emergency repairs

Ship Repairs & Hull Work

Structural steel work, tank modifications, hull inserts, lifting systems. Classification-compliant drydock operations with tier-1 shipbuilding standards.

  • Drydock structural repairs
  • Tank & hull modifications
  • Lifting systems & equipment
Portfolio: European shipyard operations

Structural Prefabrication

Steel & aluminium block construction for newbuilding and refit projects. Italian shipyard-trained fabrication methods.

  • Block prefab | Workshop or on-site
  • IACS compliant | Material traceability
  • Workshop & on-site execution
Capability: Structural prefab support

Emergency Response

NC reports, DCM before drawing revision, owner defects. Sub-4H mobilization radius France + Italy.

  • NC/DCM emergency coverage
  • Classification society protocols
  • Southern France operations center
Response Time: Sub-4H Southern France/Italy

Technical Standards & Operations

WPS compliance + Italian tier-1 methodology + Traceability

100%

RINA Qualified

All welders & carpenters classification society approved

RINA Lloyd's Register DNV Bureau Veritas
WPS Procedures

Pre-qualified welding procedures

Naval Materials

Steel 6-30mm + stainless 316L

Tier-1 Training

Major Italian shipyard methodology

IACS No.47

Block prefab & structural standard

NDT Ready

Inspection-ready documentation

Production Standards

Italian tier-1 work discipline

Result: Documented procedures. Compliant joints. Certified crew. Production standards reduce incidents.

Surface Preparation Excellence

IACS Reg.47 steel prep protocols + NDT-grade finish standards

  • IACS Reg.47 steel preparation protocols
  • Grinding/blasting capability for hull standards
  • NDT-grade surface finish (Sa2.5/Sa3 standards)
  • Pre-paint inspection + coating-ready verification

Result: Classification society-approved surface finish. Coating adhesion standards met. Zero pre-paint rejections.

Unplanned Work Response

NC | DCM | DF — Real shipyard operations intelligence

NC — Non-Conformity

Technical Non-Conformity

Supplier errors, material defects, fit-up failures found during build. Immediate scope assessment within 24H.

Action: Remove defect → Re-weld WPS-compliant

DCM — Design Change

Engineering Mod

Owner modifications before official drawing revision. Work from marked-up prints, coordinate with design office.

Approach: Adapt scope → Document as-built

DF — Defect Remediation

Class Findings

Classification society findings, owner technical objections requiring WPS-compliant rework + NDT verification.

Protocol: Rework → NDT → Documentation

Emergency Coverage

France-Italy

NC/DCM emergency response capability. Sub-4H mobilization radius Southern France + Italian yards. Classification protocols.

Response: Sub-4H Southern France/Italy

Track record: Unplanned work specialists. Scope clarity within 24H arrival.

Performance Dashboard

Standards compliance + speed vs European shipyard benchmarks.

Certified Personnel 100% All welders RINA/Lloyd qualified Zero unqualified crew on-site
Mobilization Speed 48H Site deployment ready France/Italy coverage
Concurrent Site Operations Multi-Site Flexible deployment model Regional coverage ready
Equipment Ownership Owned Zero rental dependencies Immediate availability
Above industry standard
SS SRLS performance

Who We Are

SS SRLS is a 20+ year Italian naval contractor. RINA-qualified crews trained in Italian tier-1 shipyard methodology. Ships built by skilled trades—crew capability supported by offshore-discipline coordination.

The Execution Team

RINA-Qualified Welders: 8-12 years average major Italian yards. MAG/MIG full-penetration. Stainless 316L, aluminium 5083, high-tensile steel. Technical drawing interpretation, in-situ geometry adaptation.

Carpenters: 10-15 years naval block prefab and outfitting. Complex joinery, insulation packages, panel work. Yacht-grade finish standards applied to commercial vessel scope. Material selection (fire-rated, marine-certified).

Safety Certifications: PTW Supervisor credentials, MEWP/forklift operators, confined space quals. Offshore operations discipline (permit-to-work, LOTO, gas testing protocols). French worksite regulatory compliance.

Coordination & Methodology

Site Coordination: 16 years combined naval experience (10 years sea-going offshore + yacht operations, 6 years Italian shipyard production supervision and site management). Offshore critical-path discipline integrated with Italian production methodology.

Technical Standards: WPS methodology, IACS No.47 standard application, NDT-ready documentation. Material traceability, mil-certificate management. Classification society interface (RINA/Lloyds/DNV/BV).

Emergency Response: Unplanned work specialists—NC (non-conformities), DCM (design changes), owner defect remediation. Scope assessment within 24H of arrival. French-based operations center reduces response time.

NDT Ready

How We Work

Self-sufficient deployment — Equipment to execution

Deployment Process

  • Pre-Mobilization: Site assessment, protocol alignment, equipment staging
  • On-Site Operations: WPS adherence, daily compliance logs, interface with site management
  • Technical Verification: Work prepared for NDT acceptance per production standards
  • Completion: Documentation handover, equipment demobilization, final inspection

Completed Projects

Mardi Gras - Carnival Cruise Line
Thruster grid positioning with hoists
Grid after trimming
Grid welded - NDT passed - Delivery

Mardi Gras

Carnival Cruise Line | Excel-Class | 181,808 GT
2025 France Bow Thruster Grids

Installation of bow thruster protection grids on complex geometry. The raked and flared bow configuration required meticulous in-situ adaptation: oxy-acetylene torch trimming of all edges, progressive positioning using hoist systems on padeyes, centering and rotation according to technical specifications in the presence of owner representatives and yard markers. Final wire-feed welding to hull plating.

Structural Carpentry In-Situ Trimming Owner Coordination
Structural Block Prefabrication
Structural module 1
Structural module 2

Structural Block Prefabrication

Structural Carpentry | Workshop Fabrication
2026 France Platform Extension

Workshop prefabrication of 2 structural modules for material loading platform extension. HEA 140x140x10 beams, angles 60x40x6 and 80x60x8. Module dimensions: 8500x2000mm. Components supplied by shipyard, assembly and wire-feed welding with full penetration performed by SS SRLS per WPS.

Block Prefabrication Workshop Fabrication
Hull Plating Inserts and Tanks
Hull insert 1
Hull insert 2
Hull insert 3
Hull insert 4
Hull insert 5

Hull Plating Inserts & Tanks

Naval Carpentry | Structural Repairs
2025 France Hull Maintenance

Plate replacement and structural inserts on hull plating and internal compartments. Work performed across various spaces: engine room, tanks, superstructures. Cutting, bevel preparation, in-situ fitting and full penetration welding per WPS with NDT controls.

Hull Inserts Tank Repairs NDT Welding
Yacht Extension Block
Extension block 1
Extension block 2

Yacht Extension Block

Block Construction | Major Refit
2024 Genoa Extension 90m → 100m

Construction of 15m x 10m structural block for yacht extension project. Conversion from 90 to 100 meters in length. Complete prefabrication with structural integration, preparation for drydock insertion and junction to existing hull.

Block Construction Hull Extension Major Refit

Contact

Technical & Projects

technical@ss-naval.com +39 349 647 9374
  • Site assessment & feasibility
  • Technical meetings (PM/Directors)
  • Crew availability Q1/Q2 2026
  • WPS & methodology review
  • Project inquiries & RFQ
Response Time: <24H
Available: 24/7 Available

Administration

administration@ss-naval.com +39 335 122 6737
  • Invoicing & payments
  • Contract documentation
  • Insurance certificates
  • Compliance documentation
Response Time: 48-72H
Available: Mon-Sat 08:00-18:00 CET